DOU 02/08/2024 - Diário Oficial da União - Brasil
Documento assinado digitalmente conforme MP nº 2.200-2 de 24/08/2001,
que institui a Infraestrutura de Chaves Públicas Brasileira - ICP-Brasil.
Este documento pode ser verificado no endereço eletrônico
http://www.in.gov.br/autenticidade.html, pelo código 05152024080200093
93
Nº 148, sexta-feira, 2 de agosto de 2024
ISSN 1677-7042
Seção 1
NORMAM-203/DPC
ANEXO 1-K
- 1-K-1 -
INSTRUÇÕES PARA NAVIOS DE PESQUISA SÍSMICA
(INSTRUCTIONS FOR SEISMIC SURVEY VESSEL)
1.
The purpose of the present Instruction is to assure the safety of seismic operation inside Brazilian Search and Rescue (SAR) area for both
Seismic Survey Vessels (SSV) and other ships in the vicinity. Due to the risk of collision, Brazilian Navy must broadcast a Maritime Safety Information
Bulletin, named “Aviso aos Navegantes” (notice to mariners).
2.
Therefore, all SSV are required to daily transmit, during the survey, a type 2 message from SISTRAM, informing the working area for the
next six days. All your SISTRAM messages must contain the “Y” field filled. This field is used to provide information about the survey and
coordinates of your working areas, separated in four parts (Y-1, Y-2, Y-3 and Y-4).
Y-1 -
Working area for the first three days.
Y-2 -
Working area for the three days following Y-1.
Y-3 -
Working area (only used when the first working area is assigned for a period of 1 or 2 days)
Y-4 -
Vessel and towed array characteristics with the following information:
One – Hull color.
Two – Superstructure color.
Three – Medium speed during surveys;
Four – Towed array characteristics;
Five – Signals used (buoys, lights, etc);
Six – Other relevant information.
Considering all maritime traffic implications, the 3-days survey area shall be as small as possible.
3.
Examples on how to fill the “Y” field of a type 2 message from SISTRAM are shown below.
EXAMPLE No 1 (Suppose the day is april/20/2001)
Y - Comments
Y-1 - Working area for 21, 22 and 23 april (first three days).
Lat dd mm,m Long ddd mm,m
Lat dd mm,m Long ddd mm,m
Lat dd mm,m Long ddd mm,m
Lat dd mm,m Long ddd mm,m
Y-2 - Working area for 24, 25 and 26 april (following three days).
Lat dd mm,m Long ddd mm,m
Lat dd mm,m Long ddd mm,m
Lat dd mm,m Long ddd mm,m
Lat dd mm,m Long ddd mm,m
Y-3 - xxx (not necessary, due to the 6 days information already provided).
Y-4 - One – Orange Hull.
Two – White superstructure.
Three – Medium speed during survey 4,0 knots.
Four – Towing 4 seismic cables 4 miles long.
Five – One white flashing light in each cable’s extremity.
Six – Berth requested 2 nautical miles.
EXAMPLE No 2 (Suppose the same situation but now on date april/21/2001
Y - Comments
Y-1 - Working area for april/22 and april/23
Lat dd mm,m Long ddd mm,m
Lat dd mm,m Long ddd mm,m
Lat dd mm,m Long ddd mm,m
Lat dd mm,m Long ddd mm,m
Y-2 - Working area for 24, 25 and 26 april (following three days).
Lat dd mm,m Long ddd mm,m
Lat dd mm,m Long ddd mm,m
Lat dd mm,m Long ddd mm,m
Lat dd mm,m Long ddd mm,m
Y-3 - Working area for april/27
Lat dd mm,m Long ddd mm,m
Lat dd mm,m Long ddd mm,m
Lat dd mm,m Long ddd mm,m
Lat dd mm,m Long ddd mm,m
Fechar